Multi-project scheduling with resource transfers

Oorspronkelijke prijs was: 76.99 €.Huidige prijs is: 19.25 €.

Companies that carry out multiple projects in parallel often pursue a resource strategy that allows multi-tasking and multi-projecting. In such an environment resources have to switch between projects repeatedly. A large amount of time is spent on transferring or adjusting resources to new tasks on different projects. These transfer times – as well as the related cost – must be considered already in the planning phase of the (multi-)project to ensure efficient utilisation of scarce company resources. The book provides a deep insight into resource transfers and the resulting (multi-)project scheduling problem as well as various methods to generate transfer-regarding…

Zur Kasse
SKU: 130bol1785434560
Category:

Beschrijving

Companies that carry out multiple projects in parallel often pursue a resource strategy that allows multi-tasking and multi-projecting. In such an environment resources have to switch between projects repeatedly. A large amount of time is spent on transferring or adjusting resources to new tasks on different projects. These transfer times – as well as the related cost – must be considered already in the planning phase of the (multi-)project to ensure efficient utilisation of scarce company resources. The book provides a deep insight into resource transfers and the resulting (multi-)project scheduling problem as well as various methods to generate transfer-regarding schedules.

Gerelateerde producten